We now have the stand up shower,toilet,sink,vanity,wallboard,and flooring. We are now faced with the actual plumbing dilemma. We have all this stuff and we now have to move the drains so it will all fit in there and still have room to move about. The shower is an acward shape and it is throwing the whole 5x8 room off.The doors open oddly and it would sit right on top of the toilet so he has to move all the drains to turn it all around. He thinks he has it all figured out now.I sure hope so. He has had a time with this little room. The weather doesn't want to cooperate with him. It is sunny when he is at work and rainy and cold when he has the time off to actually do it. We have to make a quick trip to Lowes in the morning to get the pieces he needs to move the plumbing with. We have a huge hole back there right now. He did manage to cut the floor out today.
Saturday, January 26, 2008
Subscribe to:
Post Comments (Atom)
Blog Archive
- November 2011 (1)
- September 2008 (2)
- July 2008 (3)
- June 2008 (2)
- May 2008 (5)
- April 2008 (1)
- February 2008 (3)
- January 2008 (13)
- December 2007 (4)
- July 2007 (4)
- June 2007 (5)
No comments:
Post a Comment